HUAWEI BTS 3012 PDF

HUAWEI BTS 3012 PDF

HUAWEI TECHNOLOGIES CO., LTD. All rights reserved. Upon completion of this course, you will be able to: Know the functions and features of BTS Master. Address: Huawei Industrial Base Bantian, Longgang Shenzhen . of the double- transceiver BTS family.1 Position of the BTS in the GSM. Huawei BTSAE – VR Product Description – Download as PDF File ( .pdf), Text File .txt) or read online.

Author: Najinn Faekasa
Country: Pakistan
Language: English (Spanish)
Genre: Art
Published (Last): 13 February 2011
Pages: 442
PDF File Size: 18.6 Mb
ePub File Size: 19.27 Mb
ISBN: 148-4-83563-674-9
Downloads: 29614
Price: Free* [*Free Regsitration Required]
Uploader: Magul

Modify the parameters of each level according to the requirements, and click Set.

Double density of base stations both work unit. The Configuration and Information dialog box is displayed, as shown in Figure Click Start to start the test. Timing transmission and management unit.

Please reply me within 24 hours. The number of the For a single board, it is If the Board No. The minimum cabinet rule use as few as possible cabinets for huaweii configuration. The DTRU combines two carriers into one channel. Figure Managing cell attributes Enter a value for each attribute.

If the value of this parameter is too small, the error tolerance of the random access signal is high. Your message must be betweencharacters! If Threshold the voltage of the access exceeds this threshold, the access is invalid.

Huawei BTS and Spares for sale

If the login fails, an error message is displayed. The result is displayed on the status bar in the dialog box. The BT Opstart dialog box is displayed. Presentation Description No description available. Choose the BT hjawei the management state, and click OK. Off There is no power supply or the board is faulty.

  GELENKLAGER SKF PDF

Figure shows Site Maintenance Terminal System window.

We promise repair and replace the faulty plates, feedback cycle for 24 hours. Choose the channel number and the management state, and then click OK. To set the parameters of the DATU, go to the next step. Help Center Bs new research papers in: Supports voice fax services. Select the target rack from the Select Rack list.

Huawei BTS is an indoor macro base station, we have all version in this store. Figure Channel loopback test Specify the test option, test time, power level, and sub-channel, and then click Start. Functional structure of the DDPU: Depend on the quantity you need and we receive the deposite then we will deliver in the short time. Select a site, and then double-click Transport Performance Test in the right pane. Select a site, and then double-Select a site Test in buawei right pane. TRX RF self-loop test This test is used to test the receive and transmit performance on the air interface.

There is only one DCCU and it is mandatory Converting the input and output signals of the common subrack.

Huawei BTS3012 BTS 3012 BTS312 BTS 312 GSM WCDMA indoor macro base station

With overparts in stock and access to a further 8 million through our partner network, TXO Systems owns one of the largest multi-vendor telecom inventories in the world. The interfaces on the DCSU panel: The parameters include RF resource indication nuawei, paging times, and access error threshold.

  ANIMA ARCANA EXXET PDF

Choose the TMU, port number, loop-back mode huawej enter the test duration, and click Start. The test result is listed after the test is complete.

Huawei BTS Support Guide, Manuals & PDF – Huawei

One single cabinet supports up to 12 TRXs in full configuration. The alarm ID, alarm type, and the delay time in seconds are listed in the dialog box, as shown in Figure The Site Opstart dialog box is displayed. Signaling Processing Signal Flow: Recommended Quality Verified Suppliers. That is, the RC cannot provide any service. A channel in any of the three states cannot be occupied. All our products are screened and re-packed in new, unbranded ESD packaging, ensuring they reach you in the best possible condition.

Select a site, and then double-Select a site Management Right in the right pane.

Select a site, and then double-Select a site Board Parameter Management in the right pane.